2

Skip to main content

Y2 Design Build

Clara's Full Basement Remodel — finished master suite
Featured Project

Clara's Full
Basement Remodel

A 30-day transformation — converting a partially finished basement into a private master suite for a growing family in Worthington, Ohio.

Timeline

30 Days

Investment

$50,000

Completed

August 2025

Location

Worthington, OH

When Life
Changes Quickly

When Clara first contacted us, her plan was to build an ADU at the back of her home. But after welcoming her beautiful new baby, priorities shifted. She needed a faster, more affordable solution — something that would give her family the space they needed within weeks, not months.

Instead of an ADU, we helped Clara reimagine her grandfather's home. With a move-in deadline of just 30-45 days, our design-build team stepped in to convert his partially finished basement into a fully functional living space — a private master suite complete with a spacious bedroom, full bathroom, and walk-in closet.

Racing Against the Clock

Clara needed to move in within 30-45 days — every trade had to be carefully scheduled and coordinated without delay.

Tight Deadline

30-45 day move-in requirement with zero room for delays

Utility Rerouting

Plumbing, electrical, and framing adjustments needed on the fly

Waterproofing

Ensuring proper moisture control in a below-grade living space

Trade Coordination

Inspections, materials, and crews perfectly synchronized

Before — partially finished basement
Before — basement condition

Built to Feel Like Home

Practical solutions and high-end finishes turned an unfinished basement into a true master retreat.

01

Master Bedroom

Framed and insulated with soundproofing materials, recessed LED puck lighting with dimmers, and durable LVT flooring in a warm oak finish with 40oz carpet.

02

Walk-In Shower

Tiled walk-in shower with glass enclosure for a modern look, paired with a Kohler vanity and Delta fixtures in gold finish and a large vanity sink.

03

Walk-In Closet

Built-in shelving and a sliding pocket door system that maximized space efficiency while keeping circulation smooth throughout the suite.

04

Premium Finishes

Sherwin-Williams Pure White on trim and doors, contrasted by a soft neutral wall color to make the basement feel airy and inviting.

05

Moisture Control

Quiet Panasonic vent fan installed for humidity management and air quality control in the below-grade bathroom.

06

Modern Bathroom

Large-format porcelain tile, matte black Delta fixtures, and a sleek vanity — balancing functionality and luxury in a compact footprint.

Renderings & Materials

Detailed 3D renderings helped Clara visualize the transformation and make confident decisions about finishes and layouts before construction began.

3D Renderings

Basement 3D rendering — bedroom
Basement 3D rendering — bathroom
Basement 3D rendering — closet
Basement 3D rendering — layout
Basement 3D rendering — overview
Basement 3D rendering — detail

Material Selections

Material selection — flooring
Flooring Samples
Material selection — fixtures
Fixture Selections
Material selection — tile
Tile & Finishes

The Finished Result

A fully functional master suite that allowed Clara to move in on schedule — bedroom, bathroom, and walk-in closet, all within 30 days.

Ready to Transform Your Basement?

From unfinished spaces to beautiful living areas — our design-build team delivers solutions that match your timeline and budget.